Proposal Development Document, Special Review Page, Special Review section
If the proposed project work will require a special review, details should be entered in the Special Review fields. Select the appropriate type and status for the review.
Field |
Description |
Type |
Use the drop-down list to select the type of issue that will require this proposal to undergo special review.
- Human Subjects
- Recombinant DNA
- Radioactive Isotopes
- Biohazard Materials
- International Programs
- Space Change
- Animal Usage
- Conflict of Interest
- Export Control
|
Approval Status |
Select the current approval status of the special review item from the dropdown list.
- Approved
- Exempt
- Link to IACUC
- Link to IRB
- Not yet applied
- Pending
|
Protocol Number |
The assigned WVU+kc number for the protocol associated which is undergoing special review. |
Application Date |
The date on which the application for this special review protocol was submitted. |
Approval Date |
The date on which the the special review for this proposal was approved. |
Expiration Date |
The date on which the approval for special review circumstances relating to this proposal will expire. |
Exemption # |
Select the applicable exemption number from the drop-down list that applies to this proposal. |
Actions |
Click the add button to attach the special review information |
Proposal Development Document, Proposal Page – Section Descriptions
To add a Special Review line:
- Click the dropdown list in the Type field, and select the type of review that will be required for the proposed activity.
- From the Approval Status field, select the status which currently applies to the review.
- If the current proposal is associated with an existing protocol, enter the number in the Protocol Number field.
- If the current proposal is associated with an existing protocol, enter the Application Date by selecting the date from the calendar.
- If the current proposal is associated with an existing protocol, enter the Approval Date, if approval has been granted, by selecting the date from the calendar.
- If special reveiw approval has been granted, enter the Expiration Date by selecting a date from the calendar.
- If an exemption has been granted for this special review type, choose the Exemption # from the list.
- Enter any Comments that might assist the Office of Sponsored Programs with reviewing the details of this proposal.
- Click the Add button in the Actions column to attach the special review item to the Proposal Document.